Technical guide · 5 min read
Electrical load calculation under the Saudi code SBC 401
Short answer
Load calculation under SBC 401 starts with a load schedule per circuit (connected load), then a designer-chosen demand factor, because the code allows diversity but sets no fixed table. Convert to current and balance the phases; the highest phase current sets the main breaker, then choose a cable that carries the breaker after temperature correction with acceptable voltage drop. For reference, SEC uses a 0.5 demand factor for villas in network planning.
What the Saudi code says about maximum demand
If you have a villa or building and need to know “what main breaker?” and “what cable from the meter?”, this calculation is where it starts. The Saudi Electrical Code SBC 401 is published by the Saudi Building Code National Committee at sbc.gov.sa; the current edition SBC 401-CR-2024 opens Part Three with clause 31-1, “Maximum demand and diversity factor”.
The earlier (2007) text of that clause says determining maximum demand is essential for an economic and reliable design within thermal and voltage-drop limits, and that diversity may be taken into account. In other words the code does not impose a fixed table of demand factors per appliance as some other codes do; it leaves the judgement to the designer, which is where the project engineer and consultant come in.
Steps from load schedule to main breaker
- Load schedule: for each circuit list type (lighting, sockets, AC, water heater, pump…), connected load in kVA, and phase (L1 / L2 / L3).
- Total connected load: the sum before any diversity.
- Demand factor: ratio of expected maximum demand to connected load for each group. In Saudi Arabia do not discount AC much; in summer nearly all units run together.
- Maximum demand: sum of (load × factor) per group.
- Current: three-phase I = S ÷ (√3 × V), single-phase I = S ÷ V.
- Phase balance: spread single-phase circuits so phase currents are close; the breaker is chosen on the heaviest phase, not the average.
- Main breaker, then cable: standard breaker ≥ heaviest phase current, then cable Iz after correction ≥ breaker, then check voltage drop and breaking capacity.
SEC demand factors
The Saudi Electricity Company’s Distribution Planning Standard (DPS, 2004 edition) uses demand factors to estimate a customer’s maximum demand when planning the network. These are utility-side figures, not a replacement for the installation’s own load schedule, but they are a useful cross-check:
| Category | Type of building | Demand factor |
|---|---|---|
| Residential | Villas, houses, palaces, istirahas | 0.5 |
| Commercial | Shops, workshops, stores, offices, petrol stations, malls, furnished flats | 0.6 |
| Government and services | Government buildings, hospitals, schools, clubs | 0.8 |
| Other | Mosques, gold shops, Hajj loads, street lighting | 0.9 |
| Industrial and agricultural | Factories, large farms, greenhouses | 0.9 |
Source: SEC Distribution Planning Standard, March 2004. SEC may have updated these values in later editions; confirm with your engineering office or SEC when applying for connection.
Worked example: villa on a 400 V three-phase supply
Loads and demand factors in this example are illustrative, to show the method; your project’s figures come from the drawings and equipment nameplates, and the designer sets the factors.
| Group | Connected (kVA) | Demand factor (designer’s assumption) | Max demand (kVA) |
|---|---|---|---|
| Lighting | 3.0 | 0.9 | 2.7 |
| General sockets | 8.0 | 0.5 | 4.0 |
| AC units (8 × 2.2) | 17.6 | 1.0 | 17.6 |
| Water heaters (4 × 1.5) | 6.0 | 0.5 | 3.0 |
| Kitchen appliances | 6.0 | 0.5 | 3.0 |
| Water pump | 1.5 | 1.0 | 1.5 |
| Total | 42.1 | — | 31.8 |
Current: 31,800 ÷ (1.732 × 400) = 45.9 A per phase if perfectly balanced. In practice it will not be; assume the heaviest phase after balancing is 48 A.
Main breaker: the smallest standard breaker above 48 A is 50 A; many designers choose 63 A to leave room for growth. That is a design decision for the consultant to approve, and it must suit the meter breaker set by the utility.
Cable: four-core PVC copper cable in conduit (B2, three loaded conductors) at 45 °C: 16 mm² = 62 × 0.79 = 49.0 A, below a 50 A breaker, so it fails; 25 mm² = 80 × 0.79 = 63.2 A takes a 50 or 63 A breaker.
Voltage drop over 40 m: 1.57 × 45.9 × 0.040 = 2.9 V, 0.72 % of 400 V, leaving ample margin for final circuits within the 4 % limit.
For comparison: with SEC’s villa factor (0.5) the demand would be 42.1 × 0.5 = 21.1 kVA, about 30.4 A. The gap shows why the internal installation is not designed on the utility factor alone; our summer AC load pushes real demand up.
And an apartment on a single-phase supply?
Same steps, with I = S ÷ V. Illustrative example: an apartment with 9 kVA maximum demand after diversity at 230 V: 9,000 ÷ 230 = 39.1 A, so a 40 A breaker, and the cable must carry 40 A after correction: 10 mm² wires in conduit at 45 °C carry 45.0 A and suit, while 6 mm² (32.4 A) does not. If the current approaches the breaker limit, discuss a three-phase supply with the designer.
Do not forget breaking capacity and fault current
The main breaker is chosen on two currents: the rated current from the load calculation, and the breaking capacity in kA, which must not be below the prospective short-circuit current where it is installed. The code requires the designer to assess the supply characteristics, including prospective short-circuit current at the origin (clause 31-3 in the 2007 edition). That figure depends on the building’s distance from the transformer and the size and length of the utility cable; the designer calculates it or obtains it from the supplier. Miniature breakers to IEC 60898-1 go up to 125 A and 25 kA; beyond that, moulded-case breakers (MCCB) to IEC 60947-2 are used.
At sub-boards the fault current falls with cable length, so a lower breaking capacity may be enough, but that is a calculation, not a guess. State the breaking capacity for every breaker in the BOQ; it is one of the questions that most often delays pricing.
Common load-calculation mistakes
- Sizing the breaker on the average phase instead of the heaviest.
- Forgetting future loads: an EV charger, home lift, pool, extra AC units in an annex.
- Using the 30 °C cable table without temperature correction.
- Not checking the main breaker’s breaking capacity against the prospective short-circuit current at the intake.
- Designing internal boards on the utility factor (0.5).
Safety note: this guide is engineering background, not a substitute for the project electrical engineer’s design or the consultant’s approval. Installation and termination must be done by a licensed electrician; isolate the supply at source and prove it dead with a tester before any work.
From calculation to supply
Done with the numbers? Send us the list
Send the sizes and quantities, or the full BOQ, on WhatsApp at +966 55 573 8438; our team checks the specification and replies. We reply to quote requests the same working day.
Frequently asked questions
Does SBC 401 set demand factors per appliance?
Clause 31-1 says maximum demand must be determined and diversity may be taken into account, without a fixed per-appliance table in the text we reviewed. The designer sets the factors, the consultant approves them, and SEC’s factors are a useful cross-check.
What demand factor does SEC use for villas?
SEC’s Distribution Planning Standard (2004) uses 0.5 for villas, houses, palaces and istirahas and 0.6 for shops, offices and furnished flats. These are network-planning figures; confirm the latest edition when applying.
How do I get the main breaker amps from kVA?
Three-phase at 400 V: amps = kVA × 1000 ÷ (1.732 × 400), about 1.44 A per kVA. Single-phase at 230 V: about 4.35 A per kVA. Then choose the next standard breaker on the heaviest phase.
References
We checked these sources on the last-updated date. Where the code leaves room for engineering judgement, the decision rests with the project engineer or consultant.
- Saudi Building Code National Committee — sbc.gov.sa
- SBC 401-CR-2024, The Saudi Electrical Code — table of contents (Saudi Building Code National Committee)
- SBC 401-2007 Electrical Requirements, full text (copy hosted by FKEC): §31-1, §41-2.5, §43-3.2, §52-5, Tables 52-5, 54-3, A.52-2, A.52-4, A.52-14, A.52-17
- Saudi Electricity Company, Distribution Planning Standard DPS (March 2004) — §1.4 frequency, Table 1.2 service voltages, Table 3.2 demand factors (third-party copy)
- IEC 60364-5-52:2009 Low-voltage electrical installations — Wiring systems (IEC Webstore)
- ABB SACE, Electrical Installation Handbook Vol. 2 — §2.2 current-carrying capacity (Table 8) and §2.2.2 voltage drop (Tables 1 and 3)
More guides
- Air-conditioner cable size: how many mm² do you need? How to size cables for split and central AC units in Saudi Arabia: start from the nameplate current, match the breaker, derate for heat, check voltage drop. Read the guide
- How many amps can 2.5 mm² wire carry? Wire and cable ampacity table Ampacity of copper wires 1.5–35 mm² by installation method per SBC 401 and IEC 60364-5-52, with Saudi heat and grouping factors, for 2.5, 4 and 6 mm². Read the guide
- What size breaker for an AC unit, and why does it keep tripping? How to size an AC breaker from the nameplate and cable, B vs C vs D curves, RCD points, and the usual reasons an AC breaker keeps tripping. Read the guide